Site
- Did you mean
- traps 04 241
Search results
-
Hazardous Waste
https://pested.osu.edu/hazardouswaste
rule 3745-51-04(B) and it exhibits a characteristic of hazardous waste or is listed in OAC rules ...
-
Controlled Drainage/Drainage Water Management (NRCS 554)
https://agbmps.osu.edu/bmp/controlled-drainagedrainage-water-management-nrcs-554
phosphorus loads by 0.4 lb/acre (Williams et al., 2015). Considerations A minimum of 20 feet of nonperforated ...
-
ANR Programming
https://brown.osu.edu/news/anr-programming
Meeting (Virtual) - 03:00pm to 04:00pm ...
-
Soil Test P value between 50 PPM and 120 PPM (or "Moderate" P Loss Risk Assessment)
Edge-of-field testing has shown Dissolved Reactive Phosphorus (DRP) concentrations of 0.02 to 0.4 PPM and 0.1 to ...
-
Self-Determined and Idea Starters
https://brown.osu.edu/program-areas/4-h-youth-development/self-determined-and-idea-starters
Babysitting 365.04 Natural Resources Astronomy Bats Climate Change Get Started with Composting* Crop ...
-
Spray Demo
https://pested.osu.edu/spraydemo
size for a given application situation (43:48) Calibration of field crop sprayers (30:04) Recent trends ...
-
References used in BMP pages
https://agbmps.osu.edu/references
Desulfurization Gypsum.” Journal of Environmental Quality 45 (2016):1722–1730. doi:10.2134/jeq2016.04 ...
-
Klase Ditch
https://agditches.osu.edu/klase_ditch
watershed that drains agricultural fields and pasture (94%), forest (6%), residential areas (0.4%), and ...
-
Davis-Freeman Ditch
https://agditches.osu.edu/davis_freeman
Channel Slope: 0.4% Project Length: 4029-feet PROJECT COSTS: Earthwork Cost: $23,050 - Mobilization: ...
-
Ohio Two-Stage Channels
https://agditches.osu.edu/case-studies/two-stage/ohio
(0.4%), and water and wetlands (0.2%). All of the soils in the contributing watershed are Hydrologic Soil ...